Please Upgrade Your Browser

We have detected that you are using Internet Explorer – an outdated browser which is no longer fully supported on this site. In 2020, the Internet Archive will remove Internet Explorer from its supported list of browsers, following advice from Microsoft Chief of Security, Chris Jackson.

Using an outdated browser such as Internet Explorer increases security risks and restricts functionality. As a result, modern websites such as this one may not work as they should. To access this site in full, please upgrade to an alternative, fully-supported browser

Microsoft EdgeGoogle ChromeFirefox

Labour & Material Pre Approval Form

Warranty Type & Term

Contractor Information

Distributor Information

Project Owner Information

Project Information

Roof Information

List each component (insulation, cover boards, membrane, etc) from the deck
(1)   If existing coating is aluminized, mustremove or cut through to substrate.
Adhesion test results (list resistance in pounds AND the width of the fabric)
Test Patch #1
Test Patch #2
Test Patch #3
Parapet walls (if part of project)
Basecoat
Materials
Topcoat
Materials
Granules
Materials

Attach The Following Images

Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Show size, adhesion test locations, drains, restrictions on water flow patterns, locations of existing/prior leaks/ponding, locations of moisture samples, restrictions on foot traffic and location of existing and/or planned walk pads
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Photos of of roof, edge, walls, rooftop equipment.
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
If there is any conflict between Momentive specifications or requirements and the project specification, attach a copy of that portion of the project specification

Thank You For Your Time

Contractor certifies that this information is accurate, and installation will be in accordance with current Momentive specifications.  The contractor has shown the owner a copy of the warranty that is expected to be issued.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.